Design and Environmental Evaluation Processes
The Project is currently at Phase 3 Design and Environmental Evaluation. The purpose of this phase is to develop the design of the Preferred Transport Solution identified in Phase 2 and undertake an environmental evaluation of the design to a sufficient level of detail to establish landtake requirements and to progress the project through the statutory process. The Preferred Transport Solution was on Public Display in May 2022. A copy of all of the display material presented is available here.
An update on the design of the Preferred Transport Solution was published on 23 January 2023. A copy of the drawings available here.
Phase 3 Ground Investigation Contract 1 AA Screening Determination
Phase 3 Ground Investigation Contract 2 AA Screening Determination