The study area for the N24 Cahir to Limerick Junction and Oola Transport Project can be found at the following link.
The Public Consultation No. 1 Constraints Mapping can be found at the following links:
The Public Consultation No.2 Alternatives and Options Mapping can be found at the following links:
Alternatives and Options with Agriculture & Utilities Key Constraints Sheet 2 of 4
Alternatives and Options with Hydrology, Hydrogeology & Soils & Geology Key Constraints Sheet 3 of 4
Alternatives and Options Sheet 4 of 4
The Public Display No.3 Preferred Transport Solution Mapping can be found at the following links:
Preferred Transport Solution Sheet 1 of 3 (discovery mapping)
Preferred Transport Solution Sheet 2 of 3 (OSi mapping)
Preferred Transport Solution Sheet 3 of 3 (aerial mapping)
Preferred Transport Solution Overview A3 Maps (printable maps)
Preferred Transport Solution A3 Maps – 11 Maps 1 : 10000 (printable maps)
Design update No. 1- January 2023 can be found at the following link:
Design No. 1 January 2023 – Overview
Design No.1 January 2023 – 18 Sheet layout (A3 Drawings)
Design update No. 2 – October 2024 can be found at the following link:
Design Update No.2 October 2024 – Overview
Design Update No. 2 October 2024. Road Component – 18 Sheet layout (A3 Drawings)
Design update No. 3 drawings – May 2025 can be found at the following link:
Design Update No. 3 May 2025 – Overview
Design Update No. 3 May 2025 – 29 Sheet layout (A3 Drawings)

